New Yamuna Bridge

Prayagraj

New Yamuna Bridge

Prayagraj, and the places along its rivers

What this is

A working model of the cable-stayed crossing over the Yamuna between Prayagraj and Naini, standing on a map of its real surroundings. Drag to look around and scroll or pinch to zoom. The tray at the bottom changes the place and the view, the hour, the lights and the projection. Choose a place first, then the kind of view of it. Press the clock to open the day, and slide the marker along it.

The bridge, from the designer's figures

Length1,510 m: 365 m of approach spans, the 630 m cable-stayed part, and 515 m of approach spans
Stayed spans60 – 115 – 260 – 115 – 60 m, between piers P15 and P20
Deck26 m wide: a 1.2 m median, two 7.5 m carriageways, a 1.7 m cable strip and a 3 m footpath on each side
Deck structureTwo concrete girders 18.2 m apart, a 250 mm slab, and crossbeams every 5 m
PylonsConcrete H-frames, 90 m from foundation to top. Legs 2.2 m wide and 18.2 m apart at the top, 30 m apart at the knee under the deck
StaysGalvanised locked-coil ropes, 76 to 116 mm thick
LevelsPylon top +158.5 m, deck at the pylons +98.9 m, high flood +88.0 m, low water +71.1 m. The water is drawn at +72.5 m
BuiltOctober 2000 to July 2004

Drawn from the designer's paper: Veje, Nielsen, Pedersen and Fuglsang (COWI), IABSE Reports 82, 1999. Other sources are in the reference dossier.

Measured from open map data

Measured from photographs and footage

Still assumed

Not real

Projection mapping: a proposal

Switch on Projection in the tray to see a study option. Nothing of it is installed. Projectors on a tower on the north bank light the north pylon above the deck. Their positions, lenses, aim and light output come from the designs computed in the feasibility study.

Story, games and sound

The bright button in the tray opens a one-minute story of the bridge and three games. All of it runs on the same model.

Keys

1 to 9The views of the place on screen
LNext light programme
PProjection on or off
TPlay or pause the day
[ ]Step the hour back or on
HHide the controls
W A S DIn the games: move. The arrow keys do the same
ShiftIn the games: go faster
E QIn the games: rise and sink with the camera
EscLeave a game

Data

Ground colour: Sentinel-2 cloudless by EOX IT Services GmbH (contains modified Copernicus Sentinel data 2016), CC BY 4.0.

Building footprints and heights: Google Open Buildings (CC BY 4.0). Land use, river, roads and the Fort: AMRUT city mapping on Bhuvan, NRSC/ISRO. Terrain: CartoDEM v3 R1, NRSC/ISRO. Minor streets: Microsoft Road Detections (ODbL). Railway: Indian Railways geoportal. All obtained through IndianOpenMaps, collated by the Datameet community.

The government layers carry no explicit open licence. Check their terms before reusing this map elsewhere.

Proportions of the bridge: photographs in the Wikimedia Commons category New Yamuna Bridge, used for measurement only. No photograph is reproduced here.

Typefaces: Instrument Sans, Instrument; Castoro and Castoro Titling, Tiro Typeworks; lettering in the projection: Rozha One, Indian Type Foundry (all SIL Open Font Licence). Weather in live mode, where the page runs on its own domain: Open-Meteo (CC BY 4.0; its free service is for non-commercial use).

Rendering: three.js r187 (MIT).

Starting the live model